Minerals washing drums
In order to meet the process requirements, two stage operation is generally used for ore washing. Cylinder washing machine belongs to the first stage of washing operation equipment. The process requires the cylinder washing machine to complete two tasks: one is to separate and discharge -50mm (or-20mm mm) materials into the equipment for the second-stage washing operation as soon as possible; The second is to ensure sufficient flushing time to flush the 50mm (or 20mm) of ore or gravel to achieve the purpose of recovery or exclusion.
Keywords: production equipment selection, system manufacturing, upgrading
Classification:
Mineral processing equipment
messages
Product Description
Product Introduction:
In order to meet the process requirements, two stage operation is generally used for ore washing. Cylinder washing machine belongs to the first stage of washing operation equipment. The process requires the cylinder washing machine to complete two tasks: one is to separate and discharge -50mm (or-20mm mm) materials into the equipment for the second-stage washing operation as soon as possible; The second is to ensure sufficient flushing time to flush the 50mm (or 20mm) of ore or gravel to achieve the purpose of recovery or exclusion.
Technical parameters:
Name |
Easy washable ore |
|||
ф 1500 × 6500~7000 |
ф 1800 × 6000~7000 |
ф 2000 × 6000~7000 |
ф 2200 × 6000~7000 |
|
Processing capacity Q(t/h) |
50 |
100 |
150 |
200 |
Ore lumpα (mm) |
<400 |
<400 |
<400 |
<400 |
Ore heap specific gravity |
1.25 |
1.25 |
1.25 |
1.25 |
Installation inclination β( °) |
3~3.5 |
3~3.5 |
3~3.5 |
3~3.5 |
Number of cylinder revolutions n(r/min) |
10 |
8~9 |
8~8 |
7~8.5 |
Number of cylinder screen segments |
1 |
1 |
1 |
1 |
Material residence time T(s) |
~75 |
~75 |
~75 |
~70 |
Water consumption q(m³/h) |
90 |
180 |
270 |
360 |
Installed power N(kW) |
18.5 |
22 |
30 |
37 |
Name |
Medium washable ore |
|||
ф 1500 × 7500~9000 |
ф 1800 × 7000~9000 |
ф 2000 × 7000~9000 |
ф 2200 × 7000~9000 |
|
Processing capacity Q(t/h) |
50 |
100 |
150 |
200 |
Ore lumpα (mm) |
<400 |
<400 |
<400 |
<400 |
Ore heap specific gravity |
1.25 |
1.25 |
1.25 |
1.25 |
Installation inclination β( °) |
3~3.5 |
3~3.5 |
3~3.5 |
3~3.5 |
Number of cylinder revolutions n(r/min) |
10 |
8~9 |
8~8 |
7~8.5 |
Number of cylinder screen segments |
1 |
1 |
1 |
1 |
Material residence time T(s) |
~110 |
~110 |
~110 |
~110 |
Water consumption q(m³/h) |
120 |
240 |
360 |
480 |
Installed power N(kW) |
22 |
30 |
37 |
43 |
Name |
difficult to wash ore |
|||
ф 2000 × 16000 |
ф 2400 × 10000~12000 |
ф 3000 × 10000 |
ф 3400 × 10000~12000 |
|
Processing capacity Q(t/h) |
70 |
120 |
200 |
640 |
Ore lumpα (mm) |
<400 |
<400 |
<400 |
<400 |
Ore heap specific gravity |
1.15 |
1.25 |
1.15 |
2.1 |
Installation inclination β( °) |
2.0 |
2~2.5 |
2~2.5 |
2~2.5 |
Number of cylinder revolutions n(r/min) |
7 |
6 |
5 |
5 |
Number of cylinder screen segments |
2 |
2 |
2 |
2 |
Material residence time T(s) |
~340 |
180~210 |
180~210 |
110~125 |
Water consumption q(m³/h) |
310 |
480 |
800 |
1400 |
Installed power N(kW) |
45 |
55 |
75 |
110 |
Previous Page
Next Page
Previous Page
Next Page
Related Product Recommendation
Exhaust gas scrubbing equipment
Electrolysis multi functional automatic overhead crane
online message